Our Realisations | Hydraulic & Development Projects
Study on hydrological and hydraulic for the development project of the El Waha Village
Contractor :
Tunisian National Real Estate Company (S N I T)
Project Cost: 2 500 000 $
Financing: Bank of Habitat (B H)
Project Description :
External area catchment covering 50 ha, constitute an important outside contribution. It has been assumed in the limit of this project for then being channeled witn the internal contribution towards an Outside outlet located about 700 meters away from the project. An Elementary division to subcatchments was used for dimensioning the different sections of planned storm water which primary collectors' length reached 4Km.
Related projects
Study on hydrological and hydraulic for the development project of the Bizerte Campus
Wastewater treatment Station at the maintenanceand storage Bus deposit at El Bokri
Technopole Of Monastir
"Village El Waha" at El Agba lot - Tunis
University Campus of Bizerte
All projects