
Our Realisations  |  Hydraulic & Development Projects
            
Study on hydrological and hydraulic for the development project of the El Waha Village
            Contractor :
            
            Tunisian National Real Estate Company (S N I T)
Project Cost: 2 500 000 $
Financing: Bank of Habitat (B H)
            
            
            
            
            
            
            Project Cost: 2 500 000 $
Financing: Bank of Habitat (B H)
Project Description :
            
            External area catchment covering 50 ha, constitute an important outside contribution. It has been assumed in the limit of this project for then being channeled witn the internal contribution towards an Outside outlet located about 700 meters away from the project. An Elementary division to subcatchments was used for dimensioning the different sections of planned storm water which primary collectors' length reached 4Km.
            
            
        
    
Related projects
            

            		Study on hydrological and hydraulic for the development project of the Bizerte Campus                
            
            		Wastewater treatment Station at the maintenanceand storage Bus deposit at El Bokri                
            
            		Technopole Of Monastir                
            
            		"Village El Waha" at El Agba lot - Tunis                
            
            		University Campus of Bizerte                
            
All projects
            













